翻訳と辞書
Words near each other
・ SRS
・ SRS "Dr. Vojislav Šešelj"
・ SRS (sailing)
・ SRS Cinemas
・ SRS Labs
・ SRS PU College
・ Srs travels
・ SRSD
・ SRSP
・ SRSP Flood Flow Canal
・ SRSS
・ SRT
・ SRT Communications
・ SRT Dark Red Line
・ SRT Light Red Line
SRT Red Lines
・ SRT1460
・ SRT1720
・ SRT2183
・ Srta
・ SRTM Water Body Data
・ SRTP
・ SRTV
・ SRU
・ Srubec
・ Srubna culture
・ Sruby
・ Srugim
・ Srujan Lokesh
・ Srul Bronshtein


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

SRT Red Lines : ウィキペディア英語版
SRT Red Lines

The Red Line Mass Transit System Project is a planned commuter rail system to serve the Bangkok Metropolitan Region. Part of the Mass Rapid Transit Master Plan in Bangkok Metropolitan Region, it will consist of two lines, one (also referred to as the Dark Red Line) running from Thammasat University's Rangsit campus to Maha Chai in Samut Sakhon Province, and the other (Light Red Line) running from Salaya in Nakhon Pathom Province to Hua Mak in Bangkok, with both passing through Bang Sue which will act as a connecting hub to the MRT system. As of 2012, the Bang Sue – Taling Chan segment of the Light Red Line is under construction, and the Bang Sue – Rangsit segment of the Dark Red Line is being prepared for construction bidding. Most of the railway will run alongside existing national railway tracks, eventually replacing them. Segments running through inner-city areas will be elevated, and the system will be electrified by overhead lines. The system is to be owned and is being developed by the State Railway of Thailand. Since the Red Lines run roughly along the alignment of the failed Hopewell Project, they have been described as a "Hopewell revival".〔"Reviving the former Hopewell route", translated and summarized by Wisarut Bholsithi from Prachachart Thurakij, March 4–7, 2004. "This Northern Commuter has to connect with the Airport Link which is not even at the design stage. At the minimum, the detailed design for the Airport Link must be done by July 2004. The Hopewell revival will be an elevated single floor--either shared tracks or separated tracks for High Speed Rail, DMU/Diesel Tracks, and Red Line Commuter which all have to be done in six years. The elevated section will end at Don Muang and then it will be at grade with separated tracks."〕
==References==



抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「SRT Red Lines」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.